Lockport City School District
				
				
					Lockport, NY
				
                
    Lockport City School District
Multi-Phase 2021 Capital Improvement Project
Phase 1A
- Parking and drainage improvements at multiple schools.
 - Widening of a walking trail located in a floodplain.
 - Sidewalk renovations.
 
Phase 1B
- Replacement of pedestrian land bridge including culverts to protect stream.
 
Phase 2
- Expansion of athletic facility with two new synthetic turf softball fields.
 
Multi-Phase 2017 Capital Improvement Project
Phase 1
- Design of two synthetic turf baseball fields with masonry dugouts on a site with floodplain limitations.
 - New parking lot and access road, storm water management.
 - Replacement of existing natural grass field within track with synthetic turf.
 - Resurfacing of track, new shot put, addition of steeplechase.
 - Perimeter fencing, decorative entrances to track including masonry columns and ornamental fence.
 - Traffic circulation design for track drop-off area.
 
Phase 1A
- Replacement of six tennis courts.
 - Provide three additional memorial benches and bleacher pads.
 
Phase 2
- Synthetic turf field for lacrosse, soccer, and practice football.
 - Subsurface storm water system.
 - Bleacher system with press box.
 
2013 Athletic Facilities Master Plan
- Development of a Master Plan report for all fields at three school properties.
 - Prepare a report assessing the existing conditions and field use, provide a needs assessment of each field.
 - Review maintenance practices and provide suggested additions or changes.
 - Provide planning and design ideas and cost estimates of possible changes.
 
