Finger Lakes Health
Seneca Falls, NY
Finger Lakes Health
2022 Geneva Medical Office Building
- Site design for the development of a 36,340 GSF new medical office building located adjacent the existing Ambulatory Surgery Center.
- Project planning and Site Plan Review required a zone change and subdivision plan the 22.9 acre property into two separate parcels.
- The new medical office building includes 160 paved parking spaces, on-site storm water management system (detention basins), patient drop-off loop, dumpster enclosure, storage building, wayfinding and various landscaping improvements.
- The design includes an outdoor waiting area/garden for patients and outdoor respite areas for employees.
2020 Seneca Family Health Center Additions and Renovations
- Review of zoning regulations and coordination with Code Enforcement Officer for site development.
- Prepared a detailed site plan and SEQRA for Site Plan Review.
- Site design included parking expansion, building addition, curbs, signage, lighting layout, and plantings.
- Provided an estimate of probable construction cost.
2010 Seneca Family Health
- Developed a site plan and contract documents for a new Medical Office Building located on an existing hospital campus.
- Prepared development plan for Site Plan Approval for a 1,000 s.f. building including SEQR and storm water management (SPDES), and planting plan.
- Provided weekly site inspections as part of the SPDES permit requirements.