Lockport City School District
Lockport, NY
Lockport City School District
Multi-Phase 2021 Capital Improvement Project
Phase 1A
- Parking and drainage improvements at multiple schools.
- Widening of a walking trail located in a floodplain.
- Sidewalk renovations.
Phase 1B
- Replacement of pedestrian land bridge including culverts to protect stream.
Phase 2
- Expansion of athletic facility with two new synthetic turf softball fields.
Multi-Phase 2017 Capital Improvement Project
Phase 1
- Design of two synthetic turf baseball fields with masonry dugouts on a site with floodplain limitations.
- New parking lot and access road, storm water management.
- Replacement of existing natural grass field within track with synthetic turf.
- Resurfacing of track, new shot put, addition of steeplechase.
- Perimeter fencing, decorative entrances to track including masonry columns and ornamental fence.
- Traffic circulation design for track drop-off area.
Phase 1A
- Replacement of six tennis courts.
- Provide three additional memorial benches and bleacher pads.
Phase 2
- Synthetic turf field for lacrosse, soccer, and practice football.
- Subsurface storm water system.
- Bleacher system with press box.
2013 Athletic Facilities Master Plan
- Development of a Master Plan report for all fields at three school properties.
- Prepare a report assessing the existing conditions and field use, provide a needs assessment of each field.
- Review maintenance practices and provide suggested additions or changes.
- Provide planning and design ideas and cost estimates of possible changes.
2009 Capital Improvement Project
- Scope of services included improved circulation including parent pickup/drop-off areas, parking expansion, and site work surrounding three building additions.
- 125 vehicle parking expansion included drainage, walkways and curbing.
- Resurfacing of six tennis courts.