Waterville Central School District
				
				
					Waterville, NY
				
                
    Waterville Central School District
2020 Capital Improvement Project
- Asphalt replacement at bus loop and parking lot.
 - Site work related to a new greenhouse.
 - Sanitary system upgrades.
 - Replacement of synthetic turf field.
 - Site work related to a new fuel island at the Bus Garage.
 
2014 Capital Improvement Project
Elementary School
- Parent/student drop-off and parking lot.
 - Replace concrete sidewalks and curbs.
 - New baseball field backstop.
 - Regrade around building to improve drainage.
 
High School
- Access drive improvements.
 - Repave drive to student drop-off/parking lot and repave portion of the bus loop exit.
 - Pavement repair.
 - ADA striping.
 - New long jump runways and pits.
 - Mill existing latex track surface and install new polyurethane surfacing.
 - Improve parking conflict at entry road.
 
Bus Garage
- Correct asphalt apron.
 - Install metal bollards at all overhead doors.
 
2010 Circulation Improvements
- Evaluation of campus drop-off/pickup conflicts and traffic circulation. The project resulted in the construction of a new parent drop-off loop, main entry road turning lanes, and new ADA stadium/school parking.
 - Other site improvements included new backstops, fencing and dugouts for two baseball fields and two softball fields.
 - Upgrades to track stadium fencing and gates were also provided.
 
2004 Capital Improvement Project
- Renovation of the school's existing athletic stadium including installation of a new synthetic turf field within their existing 6x6 lane running track, new track field events, resurfacing of resilient track, 200-seat visitor bleachers and renovation of existing tennis courts.
 - Site work around new building additions, fire service access road, drainage, parking improvements, memorial garden and plantings.
 - New pavement, vehicular circulation for buses and bus drivers parking. Site security/fencing improvements and drainage upgrades.
 