Willis V. Carrier Recreation Center
				
				
					DeWitt, NY
				
                
    Willis V. Carrier Recreation Center
Phased Master Plan Implementation
Phase One
- 3,000 sf Gateway Building with full concessions, restrooms, meeting space.
 - First phase of parking lot.
 - Storm water management including a detention pond.
 - Two natural grass baseball fields.
 - Green infrastructure including porous asphalt and permeable pavers.
 
Phase Two
- Synthetic turf infields for baseball fields.
 - All-inclusive/ADA playground and three basketball courts.
 
Subsequent Phases to Include:
- Additional parking for a total of approximately 200 vehicles.
 - Green infrastructure including porous asphalt and permeable pavers.
 - Storm water management including a detention pond.
 - Construction of pavilion/press box, restroom and maintenance buildings.
 - Two additional natural grass baseball fields and multi-sport synthetic turf field.
 - Bleacher seating for approximately 2,000 spectators, LED sports lighting.
 - Picnic pavilion.
 - ADA accessible walking trails designed with sustainable porous asphalt and permeable pavers.
 
2013 Master Plan
- Develop a Master Plan Design, Phasing Options and Construction Estimate for a new, all-inclusive, multi-field athletic complex.
 - Master Plan includes field layout, space requirements, bleacher seating capacities, sports field lighting, scoreboard(s), concession/restroom building sizes and layout, parking layout, storm water management concept, cut/fill analysis and other utility requirements.
 - Facility also to include all-inclusive playground, tennis court, basketball courts, picnic pavilion and walking trail.
 - Preparation of site plan graphic illustrating the final layout and related site and building improvements. The graphic plan will include potential phasing, alternates and future development opportunities.
 - Preparation of 3-D animation and visual "fly through" of the project area for fundraising purposes.
 - Investigation of SEQR documentation as requirements for agency review/approval, identify potential impacts and mitigation measures having cost implications.
 - Prepare final cost estimate for each construction phasing option and other project costs to implement the entire project Master Plan.
 